Operations Overview#
This page provides an overview of the FlexiBowl® configuration and commissioning process. The following workflow shows the main steps in sequence: click on each step to access the dedicated page.
Position and secure the FlexiBowl® on a stable, horizontal surface, observing the flatness tolerances and the dimensional requirements of the support.
Make the electrical connections following the instructions specific to the model in use (200/350 via external box; 500–1200 on the integrated panel).
Access the FlexiBowl® web interface, configure the IP address and communication type and, if necessary, enable the backlight for calibrating the vision system.
Use the guided configuration to characterise the component to be fed (geometry, overlap), test the accessories (air-blow, flip) and automatically generate the optimal movement and shaking parameters.
Use the guided configuration to characterise the behaviour of the Bulk Feeder.
Note
If the system in use is FlexiVision One, the Interface Configuration phase is managed directly by its dedicated interface. Refer to the FlexiVision One Manual.